Remove and Install the 240V Power Distribution Fuse (FH2) for Frame 7

Replace the 240V power distribution fuse (Labeled FH2) with the appropriate kit catalog number that is identified in this table:
Cat. No.
Voltage Class
IP Rating
Fuse Amp Rating
SK-RM-IBFH2-FUSE2A-F8
400V/480V/600V
IP21/IP54
15
SK-RM-IBFH2-FUSE2B-F8
690V
IP21/IP54
16
Fuse holder (labeled FH2) is on the AC precharge control panel. Follow these steps to remove and install the 240V power distribution fuse.
  1. Review the product advisories in Before You Begin.
  2. Remove power from the system.
  3. Open the enclosure door.
  4. Remove the protective guard. See Remove and Install the Protective Guard for Frame 7.
  5. Loosen the M5.5 x 13 mm Torx screw that secures the control pod assembly to the chassis.
  6. Loosen the two M5 captive screws that secure the bottom of the control pod assembly to the side panel and rotate the control pod assembly out from the enclosure.
    example of how to rotate the frame 7 control pod assembly
  7. Pull out on the tab on the fuse holder that is labeled FH2 and remove the fuse.
    example of how to remove the frame 7 240V power distribution fuse
  8. Install the 240V power distribution fuse in the reverse order of removal.
Provide Feedback
Have questions or feedback about this documentation? Please submit your feedback here.
Normal