Test Frame 8...15 Component Fuses
Follow these steps to perform a continuity test on frames 8…15 component fuses.
- Review the product advisories in Before You Begin.
- Remove power from the system.
- Open the enclosure door.
- Continuity test these fuses:
- AC precharge control board fuses (FH1)
- 240V power distribution fuse (FH2)
- Input bay 240V control power fuse (FH3)
- Control transformer fuses (FH4…FH7)
- AC precharge fused disconnect fuses (FD1)
- IP54 exhaust fan fuse
- LCL filter and power module heatsink fan fuse (F1)
- Replace all fuses as necessary.
Provide Feedback