Test Frame 7 Component Fuses
Follow these steps to perform a continuity test on frame 7 component fuses.
- Review the product advisories in Before You Begin.
- Remove power from the system.
- Open the enclosure door.
- Continuity test these fuses:
- 240V power distribution fuse (FH2)
- AC precharge control board fuse (FH3)
- Control transformer fuses (FH4)
- AC precharge fused disconnect fuses (FD1)
- Replace all fuses as necessary.
Provide Feedback