Test Frame 7 Component Fuses

Follow these steps to perform a continuity test on frame 7 component fuses.
  1. Review the product advisories in Before You Begin.
  2. Remove power from the system.
  3. Open the enclosure door.
  4. Continuity test these fuses:
    • 240V power distribution fuse (FH2)
    • AC precharge control board fuse (FH3)
    • Control transformer fuses (FH4)
    • AC precharge fused disconnect fuses (FD1)
  5. Replace all fuses as necessary.