Synchronize imported tags
Synchronize imported tags to update their data types, names, and structures.
Prerequisites
- To synchronize imported tags
- InProject view, under aCommunication station, double-clickTagImporter.The editor opens in a separate tab and displays the status of each controller tag in the project.Crossed out tags with red background may display if you:
- Remove tags from a controller and then import the tags online
- Remove tags from a file with tags and then import the tags offline
- Configure tags with a change event, transitioned event, or range transitioned eventFor more information, see Configure a change event, Configure a transitioned event, and Configure a range transitioned event.
TIP: If you import FactoryTalk Design Studio tags offline, any routine scoped tags are imported and referenced in the FactoryTalk Optix Application. However, if you then deploy the FactoryTalk Design Studio project through Logix Designer, any routine scoped tags are not deployed or downloaded to the controller because Logix Designer does not support routine scoped tags. Therefore, if you deploy that FactoryTalk Optix Application to a runtime device and connect the application to the controller, the routine scoped tag references display an error at runtime because the tags were not downloaded to the controller. - Make any necessary edits to the tags.
- SelectApply.
synchronize
Provide Feedback